|
|
6/18/2013
|
|
When:
|
Tuesday, June 18, 2013 Registration at 7:30 am
|
|
Where:
|
City of Rockford Water Division 1111 Cedar Street Rockford, Illinois 61102 United States
|
|
Contact:
|
Lisa Hoffhines
lisa@isawwa.org
|
Online registration is closed.
|
|
« Go to Upcoming Event List
|
|
|
Hydrant
Repair/Maintenance & Ductile Iron Pipe
IEPA#: 6824
SUMMARY: Ductile Iron Pipe: Design, Manufacturing Process and Installation Practices - Phil Marin, American Ductile Iron Pipe • Design of DIP per AWWA C150 in comparison to alternate materials • Manufacturing process of DIP per AWWA C151 and how it compares to alternate materials • Joints for open cut, trenchless and exposed applications • Linings and coatings • Installation of DIP – Open cut and trenchless applications like HDD and pipe bursting • Hydraulic analysis
Hydrant Repair & Maintenance - Tom Rodebaugh, American Flow Control
PRESENTERS: Tom Rodebaugh, American Flow Control Phil Marin, American Ductile Iron Pipe
REGISTRATION & HOURS: Registration begins at 7:30am. The training will start at 8:00am and
will conclude by 12:00pm. Earn up to 4 PDH’s or RTC hours.
COST:
Early Bird Registration: $35.00 Illinois Section AWWA Members • $45.00
for non members
Onsite Registration: $55.00 Illinois Section AWWA Members • $65.00 for
non members
|
|
|